Больше информации по резюме будет доступно после регистрации

Зарегистрироваться

Male, 47 years, born on 19 September 1976

Baku, willing to relocate (Kyurdamir, Tauz, Georgia, Akstafa, Gyandzha, Kazakh), prepared for business trips

Project Manager, Construction Engineer, AutoCAD Designer, Construction Site Engineer

Specializations:
  • Design engineer

Employment: full time, part time, project work

Work schedule: full day, shift schedule, flexible schedule, remote working, rotation based work

Work experience 14 years 4 months

September 2008December 2015
7 years 4 months
Azersun Holding- Industrial Investment Department

Baku, www.azersun.com

Industrial Equipment, Machine Tools and Components... Show more

Construction projects manager
•Initialization and performing of the project, including: preparation of technical tasks with taking to attention of technology requirements; evaluation of future construction place; preparation of time-table (Giant chart) and material-technical supplying of working groups; decision of technical issues on site; designing and accommodation of processing lines. •Performing constant control of activities with targeting of in-time finalizing of necessary technical and construction issues; ensuring continuous supplying of necessary materials, equipment and technology to the working groups on locations. •In case of need, perform necessary changes in drafts on place, depending from technology requirements and situation on construction site. •Gathering and distribution of technical information between of design, construction, assembling groups and exploitation staff, comprehensive coordination of their work; detection and elimination of "narrow necks" during performing of works. •Help on choosing of staff, organization of education including travel to existing facilities for this process. •Startup and commissioning of ready-to-run objects and elimination of appearing problems.
August 2005September 2008
3 years 2 months
Azerbaijan Sugar Factory

Imishli, www.asib.az/en/

Food Products... Show more

Auxiliary Facilities Manager
•Managing of Auxiliary facilities of the Sugar factory: purification, storage and distribution of drinking water; lime kiln and the lime milk preparation line; biological treatment facilities for industrial wastewater; •Organization of continuous training of the staff; drawing up flow diagrams and working schedules; scheduling of repair works; compiling the archive of drawings (equipment drawings and design documentation) of auxiliary manufacturing objects; •Public relations, working with government organizations, performing reports relative to counting of water resources consumption and solving environment questions; •Modernization existing schemes of Auxiliary manufacturing. Continuous improvement and optimization of initial P&ID of the sugar factory; •Development of Auxiliary objects and communications during the operation of the sugar factory: internal communication system, factories additional fire fighting system, factory's petrol station, etc. •Involving in education process of “Quality Management System TS EN ISO 9001:2000” certification for the factory and at the end, getting those certificates.
January 2003August 2005
2 years 8 months
Azerbaijan Sugar Production Union

Baku, www.asib.az/en/

Food Products... Show more

Lead Project Engineer
•Getting education on sugar production technology through special program "Sugar for Windows"; •Taking part on dismantling of existing sugar factory on period between 09.2003-04.2004, belonging to company “SUDZUCKER “AG, located in town Zeil-am-Main (Franken, Germany). It was an initial step in this project, so my main key responsibilities were gathering information relative to dismantled equipment (reviewing archives, making measurement on the site and preparation of shop drawings); doing photo- and video surveys of dismantling works, which were very useful on period of future installation; •Drafting layouts of various industrial facilities of Imishli sugar factory: water supply objects and waste water treatment facilities, lime kilns, lime milk and carbonic gas preparation lines; participation in designing of underground pipeline communications; •Participation in Imishli Sugar Factory's startup events; meeting with the governmental delegation led by the President of Azerbaijan Republic Mr. Ilham Aliyev, perform demonstration of lime branch work; •Elimination of startup problems and performing common equipment adjustment;
October 2001July 2003
1 year 10 months
“AZALSAN” Aluminum Joint Stock Company

Baku, www.azalsan.com

Metallurgy, Metalwork... Show more

Graphic designer
•Getting education on production of aluminum profiles by extrusion method; •Training course in Turkey about manufacturing techniques of matrices and drawing up design documentations in CAD programs. Complete training about work principles of CNC, milling, coordination machines, surface preparation by using of grinder and engraving machines; •Development of aluminum profiles drawings (existing and new systems) according to patterns; •Performing surface treatment of matrices by using of thermochemical methods (nitro carburizing).
October 2000October 2000
1 month
“Aghstafa River” Water Facilities Exploitation Department

Kazakh

Utilities... Show more

Water facilities Engineer, Water measurement Engineer
•Exploitation of hydraulic system mechanisms of the water storage basin "Aghstafa" river and the left-bank water-distributive channel; •Management of current, seasonal and off-schedule repairs of the left-bank channel. •Doing measurement of the flowing water and performing reports and schedules.

Key skills

You can change skill levels in the mobile app — the website will have this feature a little later on

MS Project Expert
AutoCAD
Teambuilding
Presentation skills
Time management
Driving Licence B
Project management
MS Outlook
MS PowerPoint
MS Visio
MS Project
Flexible and mobile
Negotiation skills

About me

I do complete managing of industrial objects erection and ensure successful on-time, on-budget delivery of these projects. My responsibilities include determining project scope, timelines, tracking project progress and measuring outcomes. During a construction process I collaborate with all internal departments, primarily with the CEO, CFO, SVP of Operations and Exploitation Manager, and vendors to ensure proper alignment to project strategy, budget and objectives. As a Project Manager, I responsible for all facets of project execution and completion. In this leadership position, I've full ownership, responsibility and accountability for the project(s) life span and success. Experience gained during construction of momentous facilities, allows me confidently implement resolving of most difficult tasks in design, construction and commissioning of the facilities. In my free of work time I like to listen national and classical music, reading detectives and I prefer to walk or run on the fresh air.

Portfolio

Higher education (master)

1999
Azerbaijan University of Architecture and Construction (AUAC)
Construction Economy, Industry and Civil Construction

Languages

AzerbaijaniNative


EnglishC2 — Proficiency


GermanA1 — Basic


RussianC2 — Proficiency


TurkishC2 — Proficiency


Professional development, courses

2015
SABIT Eneregy Efficiency in Construction Program
Department of Commerce of The United States of America, Energy Efficiency Consultant
2009
Metodologies, Concepts and Applications of Project Management
Project Managenet Institute (PMI) - Istanbul Kurumsal Gelisim, Project Manager
2006
TSE ISO EN 9000-2001 System Certificate
Türk Standardları Enstitütü, TSE İSO standards owner
2005
Sugar Prduction Technology
Headquarters of Turkish Sugar Factories Community, Technology manager

Citizenship, travel time to work

Citizenship: Azerbaijan

Permission to work: Azerbaijan

Desired travel time to work: Doesn't matter